Mangalam Projects presents
Auraville
A plotted address on the Narasapura–Malur corridor
Welcome to your new home
13.05513° N 77.95797° E

01Developer
Mangalam Projects
A legacy of delivering happiness
Mangalam Ecstasy · actual drone photograph

01Developer
Portfolio
An established residential portfolio
Aura Ville
495 plots
Narasapura–Malur Main Road
Ecstasy
214 apartments
KR Puram
Pearl
212 plots
Plotted community
Narasapura industrial area
NE-7 · Bengaluru–Chennai Expressway
Auraville13.05513° N · 77.95797° E

02Location
Location1 / 7
Auraville in eastern Bengaluru
A plotted community east of Hoskote, between Malur town and the Narasapura industrial belt, on the Narasapura–Malur Main Road.
Mangalam Auraville
Located for exponential growth
13.05513° N · 77.95797° E
STRR · Regional ring2 / 7
STRR connects the outer towns
~80km
Dobbaspet–Hoskote northern arc reported operational
The wider ring is opening in phases.
Mapped STRR route
Developing or proposed sections
NE-7 · Expressway3 / 7
The Bengaluru–Chennai corridor
NE-7 corridor runs east from the STRR junction near Hoskote, passing south of the project.
Industry4 / 7
Industry on both sides of the address
Established manufacturers operate in the Hoskote and Narasapura clusters.
Indicative industrial cluster
NE-7 · Up close5 / 7
An established regional link near the project
MoRTH records the Bengaluru–Malur section as completed and in use.
Narasapura6 / 7
The industrial belt north of your address

Narasapura electronics manufacturingTata Electronics

Narsapura two-wheeler manufacturingHonda Motorcycle & Scooter India
Immediate setting7 / 7
A closer look at the estate's surroundings
Local approach roads near Kanivenahalli connect the estate with the Narasapura–Malur corridor.
The next step is a drive through your everyday route.

03Market evidence
Knight Frank · Bengaluru 2025
Bengaluru's leading warehousing cluster
54%
Hoskote–Narsapura's share of Bengaluru leasing in 2025
4.4 million sq ft in the cluster
Knight Frank, India Warehousing Market Report 2025, Bengaluru. Warehousing data, not plot returns. The cluster definition includes Malur.

03Market evidence
CBRE · India logistics H2 2025
A broad national logistics demand base
30+ mn sq ft
India warehousing absorption, H2 2025
64%3PL and engineering & manufacturing together account for this share of take-up.
CBRE, India Logistics Figures H2 2025, 13 Feb 2026. National logistics context. "Other sectors" is the calculated remainder.

03Market evidence
JLL · Bengaluru industrial Q2 2026
Bengaluru's industrial momentum
3.9mn
sq ft demand in Q2 2026
3.7mn
sq ft new supply in Q2 2026
“Rents up 4.5% y-o-y”
JLL, Bengaluru Industrial Market Dynamics Q2 2026
Published 11 Aug 2026. Rent change refers to industrial and warehousing space, not residential plots.

03Market evidence
The wider corridor
Established companies in the wider corridor
Tata Electronics
NarasapuraManufacturing premium personal electronic devices
Honda
Narasapura96-acre two-wheeler manufacturing plant
Volvo Group
HosakoteTruck manufacturing, distribution and remanufacturing
And many more across the industrial region

Official company websites. Area context only; no affiliation or endorsement of Auraville is implied.
Destinations
The destinations that shape everyday life
Malur town
Shops, local services and the railway connection.
Schools & healthcare
Ujwala Vidya Mandhira, JSS, BGS, St. Mary's, Sanjana and Ayush.
Your routine is the best route test.
Auraville · actual photograph

03Location case
Summary
The location case for Auraville
Global giants nearby
Established employers give the corridor a working economic base.
Regional connectivity
STRR and NE-7 connect the area with wider markets.
Ready to move in
Roads, landscaping and the clubhouse are all ready for use.

04The estate
Actual project photography
Auraville
A community you can walk through today

04The estate
At a glance
The estate
at a glance
A plotted community with landscaped spaces, internal roads and a clubhouse.

04The estate
Not an artist's impression
The clubhouse, as built
Rooftop
The pool terrace
Open views and space to unwind

04The estate
Inside the clubhouse
The spaces inside

Reception & lounge

Gym

Indoor games
Outdoors
Outdoor space for everyday living
40+
amenities across the estate
- Themed parks
- Walking paths
- Children's play areas
- Sports spaces
Existing children's play area · actual photograph

05Plots
Plot formats
Plot formats for different plans
Dimensions in feet. Areas shown are plot areas. Drawn to one common scale.

05Plots
Infrastructure
The infrastructure around your plot
RCC concrete roads
With paved pathways
Underground services
Power, drainage and water lines
Street lighting
LED fixtures along internal roads
Landscaped avenues
Tree planting and community spaces

05Plots
Choosing a plot
The details that make a plot right for you
01 · FacingEast or west
Subject to available stock
02 · AreaExact extent
Confirm the dimensions and area
03 · PositionCorner, park-facing
Premiums vary by position
04 · Your planWhat you can build
Check setbacks and permitted construction
Final selection follows the sanctioned layout, plot documents and written quotation.

06Pricing
₹200 / sq ft
Infrastructure
₹1.25 lakh
Clubhouse membership
₹59,000
Legal charges in examples
Supplied price sheet. PLC, corpus, maintenance and government charges may be additional. Rates subject to confirmation.

06Pricing
Amounts in ₹ lakh
Standard plot quotations
| Plot | Facing | Land | Infrastructure | Club + legal | Quoted total |
| 30 × 40 | West | 42.00 | 2.40 | 1.84 | 46.24 |
| 30 × 40 | East | 44.40 | 2.40 | 1.84 | 48.64 |
| 30 × 50 | West | 52.50 | 3.00 | 1.84 | 57.34 |
| 30 × 50 | East | 55.50 | 3.00 | 1.84 | 60.34 |
Source: supplied Price Breakup. No quoted totals are available for 30 × 60 or 40 × 60 plots.

06Pricing
Worked example · 1,200 sq ft
A 30 × 40 west-facing example
₹46.24lakh
Quoted subtotal for 1,200 sq ft
₹42,00,000
Land: 1,200 × ₹3,500
₹2,40,000
Infrastructure: 1,200 × ₹200
₹1,25,000
Clubhouse membership
The full cost is the subtotal plus the applicable additional charges.
Supplied price sheet. The quoted subtotal includes the four listed components only.

06Pricing
Confirm in writing
The additional charges to confirm
| Charge | Price-sheet basis |
| Registration / government charges | As per government norms |
| Corpus fund | ₹10 per sq ft |
| Maintenance | ₹1.50 per sq ft for 12 months + 18% GST* |
| Preferential location charge (PLC) | Varies by plot position |
The source does not specify whether the maintenance rate is monthly. No annual total has been assumed.

06Pricing
Plot-specific example
A plot-specific example: 2,408 sq ft
₹1,07,79,200
Quoted subtotal for the odd-size example
₹1,01,13,600
Land including PLC
₹4,81,600
Infrastructure: 2,408 × ₹200
Example from supplied price sheet. Exact shape, plot identity, PLC and availability require the individual quotation.

06Pricing
Schedule
The payment sequence
₹1 lakh
Booking amount · part of the 25%
25%
At sale agreement
Includes the booking amount
75%
On registration
Payments to M/s Mangalam Projects, as stated in the price sheet.
Payment schedule: supplied price sheet. The signed agreement governs the payment base, dates and terms.

07Decision
Bringing it together
The Auraville decision
The area
A manufacturing corridor with independent evidence of logistics demand.
The property
A plotted estate with real infrastructure and lifestyle spaces to inspect.
Your plot
A format, facing and position that suit your plan.
The numbers
A written quotation that makes the complete cost clear.

04Masterplan
Excellence in every detail
The masterplan
31 acres laid out in two phases, with six themed parks set between the plot rows.
P1 – P6 · Themed parks
Internal road network
Park P11 / 6
Recreational Park
- AAmphitheatre
- BEvent lawn
- CWater fountain
- DChildren's play area
- ESeating pavilion
- FParty lawn
- GClock tower
Park P22 / 6
Sports Park
- AMultipurpose court · tennis & basketball
- BCricket practice net
- CJogging and running track
Park P33 / 6
Children's Play Park
- APlay lawns
- BLawn mounds
Play area
Lawn mounds
Play lawnsRepresentative imagery
Park P44 / 6
Afforestation Park
- ADense tree plantation
- BWoodland path
- CSeating nodes
- DPlay lawn
- ELotus pond
- FFlower bed
Lotus pond
Flower bed
Woodland pathRepresentative imagery
Park P55 / 6
Relaxation Park
- APlay ground
- BPlay lawn
Family time
Garden walks
Shade and quietRepresentative imagery
Park P66 / 6
Elder's Park
- AYoga lawn
- BMeditation pavilion
- CChit-chat corner
- DJogging path
Chit-chat corner
Jogging pathRepresentative imagery
Green across both phases
Six themed parks, one community
From the amphitheatre and sports courts in Phase 1 to the woodland and yoga lawns in Phase 2.

04Amenities
Flawless execution, limitless lifestyle
Designed for elevated living
The clock towerWhere the estate keeps its own time
The amphitheatreCreate your stories under the open skies
The children's realmVibrant spaces where kids can explore and grow
The avenuesTree-lined boulevards taking you home
The sports parkCourts and tracks to fuel your active lifestyle
The grand entranceA statement every time you return home

04Amenities
40+
Amenities, already in place
Aroma gardenReflexology pathMulti-purpose courtHalf basketballCricket netsJogging trackSeating plazaLawn moundsTreecourtWoodland pathHammock gardenLotus pondMeditation pavilionYoga lawn
The clock tower
Where the estate keeps its own time
A landmark at the heart of the Recreational Park, beside the clubhouse and the amphitheatre.
Actual photograph

05Plots
Plot sizes on the masterplan
Find your format on the masterplan
30 × 40 ft
30 × 50 ft
30 × 60 ft
40 × 60 ft
Format1 / 4
30 × 40ft
9.14 × 12.19 m
1,200 sq ft plot area
Format2 / 4
30 × 50ft
9.14 × 15.24 m
1,500 sq ft plot area
Format3 / 4
30 × 60ft
9.14 × 18.28 m
1,800 sq ft plot area
Format4 / 4
40 × 60ft
12.19 × 18.28 m
2,400 sq ft plot area
Every format, one plan
Four plot formats for different plans
30 × 40 ft
30 × 50 ft
30 × 60 ft
40 × 60 ft
Highlights follow the masterplan colour legend. Confirm the exact plot, size and availability on the sanctioned layout.

05Specifications
What runs beneath the road
Built from the ground down

05Specifications
The unseen precision of long-term value
The estate, by the numbers
31acres
Total land area (124,000 sq m)
37,200sq m
of roads, about 30% of the estate
7,200+ trees
Landscaped across the property
5borewells
Connected to the storage sump
5crore litres
Rainwater captured annually*
21km
Underground electrical cabling
62km
Sewage, stormwater and water pipelines
300lights
Smart, low-draw LED fixtures
RERA · Phase I PRM/KA/RERA/1265/347/PR/190823/006189
RERA · Phase II PRM/KA/RERA/1265/347/PR/190823/006190